Skip to content
How a job runs

From the first visit to the last coat.

Most jobs run through the same steps. Knowing them ahead of time makes the quote easier to read and the schedule easier to plan around.

Drum sander mid-way through an old red oak floor, half bare and half old finish
Red oak floor, mid-sanding
  1. STEP 1

    The first visit to measure your hardwood floor

    We come to the house, measure the rooms and look at the floor you have now. For a refinish we check how much wood is left to sand. For a new floor we check the subfloor and ask about the heating system. A quote follows the visit.

  2. STEP 2

    Stain samples on your own boards

    We put two or three stain colors on boards of the species you are getting, in the room that matters most, and leave them overnight. Morning light and lamp light show different things, so pick after you have seen both.

  3. STEP 3

    Scheduling a hardwood floor install or refinish

    New wood sits in the house for several days before it goes down, with the heat or air conditioning running. A refinish needs the rooms empty. We lay out the days before we start, including the days the floor cannot be walked on.

  4. STEP 4

    Sanding the hardwood floor

    A site-finished or refinished floor is sanded flat as one surface. The sanders run through vacuums, and we cover doorways and vents and wipe the room before the first coat. A prefinished floor skips this step.

  5. STEP 5

    Staining and finishing the floor

    Hardwax oil goes on in one or two coats and waterborne finish in two or three, with dry time between coats. The floor needs time to cure before furniture goes back, and we tell you when.

  6. STEP 6

    Caring for the finished hardwood floor

    We leave care instructions for the finish you chose: which cleaner, which mop and what to avoid. A solid hardwood floor can be sanded and refinished again years from now.

Before you call

Questions about how a hardwood floor job runs

Do we have to move out while the floor is done?

Usually no. Many families live upstairs or on one side of the house while we work on the other. The floor cannot be walked on between coats, and we tell you which days to plan around before we start.

How far ahead should we book?

Call as soon as you know the rough timing. New-build floors are scheduled around the other trades, and refinishes around when you can empty the rooms.

What do you need from us before the first visit?

The address, the rooms involved and a rough idea of what you want. A photo helps.

Start here

Book the first visit.

Send a few details and a photo if you have one. We will call to set up a visit and bring samples.

Your details stay with us.

Call Text Consultation