Wood floor installation service · Buffalo, MN Hardwood floors, installed and finished in your home.
We install new hardwood floors, site-finished or prefinished, and sand and refinish the ones already down, for homes across Wright County and the west metro.
- Site-finished or prefinished We install both. A site-finished floor is sanded flat and finished in your home, and a prefinished floor is ready to walk on the day it goes in.
- Samples on your own boards Stain and finish samples go on your wood and sit overnight, so you choose the color in your light.
- Buffalo, Minnesota Wright County, the Highway 55 corridor, the Lake Minnetonka towns and the west metro, and north to lake homes around Brainerd.
Rated 5.0 on Google by our hardwood flooring customers.
Hardwood floor installation, refinishing, stairs and pattern work.
Wood floor installation
Solid and engineered hardwood, site-finished or prefinished, laid over a subfloor we flatten first.
Wood floor installationSanding and refinishing
Back to bare wood, then stained and finished in place.
PatternsHerringbone, chevron and inlays
Laid out from the center of the room so the pattern sits square.
FinishesStains and finishes
Sample colors on your own boards, in your own light.
StairsStair treads and risers
Same species and finish as the floor they meet.
RepairsRepairs
New wood laced in so the patch disappears after refinishing.
BuildersNew construction flooring
Scheduled around the other trades on a new build.
Site-finished or prefinished hardwood, and when each one fits.
A site-finished floor is laid raw, sanded flat as one surface, then stained and finished in your home after we try the color on your own wood. A prefinished floor arrives with a factory finish and can be walked on the day it goes in. We install both, and we will tell you which one suits your house.
Norr is Burton Jurmu's company. About Burton
Hardwood floor styles we install, from plank to herringbone.
Hardwood flooring from Buffalo across Wright County, the west metro and the lakes up north.
We work in Buffalo and Wright County, along Highway 55 into the west metro, around Lake Minnetonka, and north to lake homes around Brainerd. If your town is not listed, call and ask.
All service areasHardwood flooring questions we hear on the first visit.
Site-finished or prefinished, which should we choose?
It depends on the house and the schedule. A site-finished floor is sanded flat as one surface after it is installed, so there are no bevels between boards and the color is matched on your wood in your light. A prefinished floor has a factory finish and is ready the day it goes in. We install both.
How much dust does a refinish make?
Some. The sanders run through vacuums that catch most of it at the floor, and we seal doorways and vents with plastic before we start. Plan to wipe the surfaces in the rooms we sand and expect a light film in the rooms next to them.
Hardwax oil or polyurethane?
Hardwax oil soaks into the wood and leaves a matte surface that looks close to raw wood. You can repair a worn spot by cleaning and re-oiling that spot. Waterborne polyurethane builds a harder film on top and takes more abuse before it shows wear, but a repair means recoating the whole area. We will put both on your own boards so you can compare them.
How long does a refinish take, and can we stay in the house?
A typical main floor is several working days from the first sanding to the last coat, then a cure period before the furniture goes back. Many families stay in the house and live upstairs or on one side of it while we work. We lay out the schedule room by room before we start.
Tell us about the floor you want.
Send a few details and a photo if you have one. We will call to set up a visit and bring samples.