Hardwood stair treads matched to your floor
A tread is one wide board, and a wide board shows grain and color more than a strip floor does. We pull tread stock from the same species and grade as the flooring. On a refinish, we sand the treads along with the floor and stain them from the same can on the same day, which is how the color lands the same.
Finishing stair treads while you live in the house
We sand treads on the stair with an edger and by hand, because a tread cannot go through the big machine the way a floor can. If you are living in the house, we finish every other tread on the first day and the rest on the second, so there is always a path up.
What our hardwood stair tread work includes
- Treads cut from the same species and grade as the floor
- Every rise measured before a tread is set
- Finished every other tread so the stairs stay usable
How we build and finish hardwood stairs
- STEP 1
Measure the stair
We measure every rise and run, and check what is under the carpet.
- STEP 2
Tread and nosing stock
Treads, risers and nosing come in with the flooring order so the species and grade match.
- STEP 3
Fit and fasten
Old treads come off or get capped. New treads are glued and screwed so they stay quiet.
- STEP 4
Sand, stain and finish
Treads are sanded in place and finished on an alternating schedule so you can still get upstairs.
What moves the cost of hardwood stair treads and risers
Stairs are priced by the step. A closed stair with painted risers and straight treads is the simplest. Open ends, stained risers and a landing each add time.
- Number of treads and landings
- Open or closed stringers
- Painted or stained risers
- Cap over existing treads or full replacement
- Species of the tread stock
Hardwood stair tread questions
Can you put hardwood treads over my carpeted stairs?
Yes, on most stairs. Under the carpet there are construction grade treads with a rounded nose, and we either cap them with a solid tread or remove and replace them. The deciding factor is height, so we measure every step before choosing a method.
Will the stairs match my floor exactly?
Yes, when we install or refinish the floor at the same time, because the treads come from the same species and grade and are stained from the same can. Matching a floor that has been down for years is harder, so we sample on a tread first.
How long are the stairs out of use?
On a waterborne finish, you can use the stair in socks the morning after each coat, and we finish every other tread so there is a path up even on finish days. Shoes stay off for the first week.