Where hardwood flooring fits in a new construction schedule
Hardwood goes in after the drywall is primed and the HVAC is running, and before the cabinets if the floor is to run under them. Some builders set cabinets first and we lay to them. On a site-finished floor, the sanding and finish happen later, after the painters have done their final coat.
What has to be ready before the hardwood is delivered
The flooring comes into the house once the furnace or air conditioning has been running for at least a week. New drywall, fresh paint and a new basement slab all put water into the air, and wood delivered into that house picks it up. Where the floor goes over a slab, we test the concrete before we agree to a date.
What our new construction hardwood flooring includes
- Slab tested before an install date is set
- Flooring delivered only after the HVAC has run a week
- Finish scheduled after final paint so no trade walks on it
How hardwood flooring runs on a new build
- STEP 1
Bid from the plans
We take the square footage off the plans and confirm any slab or radiant areas.
- STEP 2
Readiness check
We meter the subfloor or test the slab and confirm the HVAC has been running.
- STEP 3
Install
The floor goes down. A raw floor is covered with breathable paper and handed back to the trades.
- STEP 4
Finish after the trades
On a site-finished floor we return after final paint to sand and finish it.
What moves the cost of hardwood flooring on a new build
New construction prices from the plans, and the biggest lines are species, width and square footage. Two trips, one to install and one to finish, are built into every site finished job. Prefinished product skips the finish trip.
- Species, width and square footage from the plans
- Cabinets before or after the floor
- Slab areas and any moisture mitigation
- Radiant heat zones
- Stairs and pattern areas
New construction hardwood flooring questions
Can you install hardwood over in-floor heat?
Yes, with engineered planks over the heated slab, after the system has run long enough to dry it. Engineered is the right product over radiant because its plywood core moves far less with heat and moisture than a solid board does.
How long does the finish shut the house down?
Three to five days with the floor off limits to every trade. We ask the builder to hold all deliveries in that window, because a footprint in a wet coat means sanding and recoating that room.
Do you work with the builder or the homeowner?
Both. On most new builds the builder holds the schedule and we take the floor selections from the homeowner. We send the builder the scope, and we sit down with the homeowner to settle species, width, grade and finish.