Subfloor prep before a hardwood floor goes down
A wide board bridges low spots that a narrow strip would follow, and that bridging is where hollow sounds and squeaks come from later. We check the subfloor with a straightedge. High spots get ground or sanded down, and low spots get a patch or a shim. We also meter the subfloor for moisture, because a damp subfloor pushes water into the new wood.
Letting the wood acclimate to a Minnesota house
A Minnesota house is dry in January with the furnace running and humid in July, and a wide board shows that swing as gaps in winter and tight boards in summer. We bring the flooring into the house after the heat or air conditioning has been running for at least a week, then meter the boards before we start.
What our hardwood floor installation includes
- Subfloor flattened before any wood goes down
- Engineered or solid chosen for your house
- Site-finished or prefinished, whichever suits the house and the schedule
How a hardwood floor installation runs
- STEP 1
Site visit and measure
We check the subfloor with a straightedge and a moisture meter, and talk through species and width.
- STEP 2
Order and acclimate
The flooring is delivered after the HVAC has run for a week, then acclimates in the rooms.
- STEP 3
Prep and install
We flatten the subfloor, then lay the floor on a snapped layout.
- STEP 4
Sand, finish and cure
A site-finished floor is sanded flat and finished. A prefinished floor is ready when the last board is in.
What moves the cost of hardwood floor installation in Buffalo, MN
We price every floor from a site visit, and the number comes from a handful of things you can see for yourself. The species and the width of the board are the biggest.
- Species and grade of the wood
- Board width
- Solid or engineered construction
- Subfloor condition
- Finish system
Hardwood floor installation questions
Should I pick solid or engineered?
Engineered for a slab, a basement or radiant heat. Solid for a conventional wood subfloor in a house with humidity control. Both can be the same white oak on the surface, so the look comes out the same.
Do I need to leave the house during installation?
For the install itself you can stay. The noise is a daytime noise and we close off the rooms we are working in. A floor finished on site is off limits from the first coat until it can take socks.
Can you install over my existing hardwood floor?
Sometimes. The old floor has to be flat and well fastened, and the added height has to work at the doors and the stairs. Most of the time tear out is the better route, because it lets us fix the subfloor.