Skip to content
Refinishing

Hardwood Floor Refinishing in Buffalo, MN and the West Metro

We refinish hardwood floors in Buffalo, Wright County and the west metro suburbs, sanding them back to bare wood and finishing them in place. A refinish is the chance to flatten a floor that has cupped and to change its color.

Drum sander mid-way through an old red oak floor
Drum sander mid-way through an old red oak floor

How we keep sanding dust down during a refinish

Sanding a floor makes dust. Our sanders run through vacuum collection that catches most of it at the floor. Fine dust still escapes at the edger and in the corners, so we seal doorways and HVAC returns with plastic and wipe the room down before finish goes on. Expect a film on windowsills and shelves in the work area.

Living in the house while the floors are refinished

You can stay in the house through the sanding on most jobs. We seal off the rooms we are working in, and sanding is loud but it is a daytime noise. The finish is the harder stretch. Once stain and the first coat go down nobody walks on that floor until we say so.

What our hardwood floor refinishing includes

  • Vacuum collection on the sanders and plastic on the doorways
  • Damaged boards replaced before sanding so patches disappear
  • Sample stain colors on your own floor before we commit

How a hardwood floor refinishing job runs

  1. STEP 1

    Look at the floor

    We check how much wood is left and which boards need replacing, then talk about color and finish.

  2. STEP 2

    Repairs and the first cut

    Damaged boards are replaced first. Then the first sanding pass flattens the floor.

  3. STEP 3

    Finer grits, edges and samples

    We sand through the finer grits, then put stain samples on the bare floor for you to see overnight.

  4. STEP 4

    Stain, finish and cure

    Stain, then the finish coats on their schedule. We tell you when furniture can go back.

What moves the cost of hardwood floor refinishing in Buffalo, MN

Square footage sets the base, and the condition of the floor sets the rest. A flat floor with a thin, worn finish sands fast. A floor that has cupped or carries a thick old finish needs more passes.

  • Square footage and the number of rooms
  • How flat the floor is
  • Boards that need replacing
  • Stain or a natural finish
  • Stairs in the scope
Before you call

Hardwood floor refinishing questions

Can you make my red oak floor look lighter and more natural?

Yes, within limits. Red oak carries pink tones that come through a clear finish, so a pale natural look needs a stain or a tinted oil that counters them. It will never read as white oak up close.

How long are we off the floor after the finish goes on?

With a waterborne finish, socks the morning after the last coat, furniture after about three days and rugs after two weeks. During the finish days the floor is off limits to everyone, pets included.

Do we need to move the furniture out?

The rooms need to be empty before the sander comes in. Most clients move small things themselves, and we talk through the heavy pieces, the refrigerator and the stove at the site visit.

Related services
Start here

Get a quote for sanding and refinishing.

Send a few details and a photo if you have one. We will call to set up a visit and bring samples.

Your details stay with us.

Call Text Consultation