Replacing boards in a hardwood floor repair
We remove the damaged boards and feed new ones into the surrounding floor so the end joints stagger the way the original floor does. We cut a board out of the floor and take it with us to find stock that matches. After that the whole room gets sanded flat and finished so the new boards sit flush and take the same color.
Water damage and pet stains in hardwood floors
Water cups the boards and leaves gray or black stains where it sat. A floor that is cupped but still sound often flattens on its own once the source is fixed and the house dries out. Pet urine soaks into the wood, and the black stain it leaves goes deeper than any sanding reaches. Those boards get replaced.
What our hardwood floor repair includes
- New boards matched to a board cut from your floor
- Wet floors metered and dried before anyone sands them
- Squeaks fixed from below where the basement allows
How a hardwood floor repair runs
- STEP 1
Diagnose
We find the cause and count the boards that need to go.
- STEP 2
Find the match
We cut a board out of the damaged area and take it with us to match the new boards.
- STEP 3
Repair
New boards go in, and the subfloor is fixed where water reached it.
- STEP 4
Blend the finish
A buff and recoat if the floor allows it, or a full sand and finish of the room.
What moves the cost of hardwood floor repair in Buffalo, MN
Repairs are priced by what we find, and the two biggest factors are how many boards have to come out and how hard the match is.
- Number of boards coming out
- How hard the boards are to match
- Drying time and any subfloor repair after water
- Buff and recoat or full sand and finish
- Access from below for squeaks
Hardwood floor repair questions
Can you fix one board without redoing the whole floor?
We can replace the board, and the new board will show until the room is refinished. It carries a fresh color against a floor that has aged, so it reads as a patch.
My floor cupped after a leak. Do the boards need to be replaced?
Often they do not. A floor that is still fastened and sound tends to flatten over several weeks once the source is stopped and the house is dried out. Boards that stay cupped after drying or that carry black stains get replaced.
What is the difference between a buff and recoat and refinishing?
A buff and recoat scuffs the existing finish and adds one new coat on top, in about a day, with the color unchanged. Refinishing sands the floor to bare wood, which removes scratches and allows a new color.