The three hardwood floor finishes we work with
Hardwax oils soak into the top fibers of the wood and harden there, so the floor looks and feels like bare wood with a low matte sheen. Waterborne finishes build a clear film on top of the wood and stay clear over time, so a light floor stays light. Oil modified polyurethane is the finish most older Minnesota floors already carry, and it ambers as it cures.
We sample stain colors on your own boards
A stain chart is printed on paper, and a showroom sample was sanded by someone else on different wood. We sand your floor, or a spare run of your new planks, then put down a few candidates side by side. You look at them in morning light and again after dark with the lamps on.
What our hardwood floor staining and finishing includes
- Samples on your own sanded boards, left overnight in your light
- Water popping for deeper, even color when the stain needs it
- Care instructions for the finish you picked
How we stain and finish a hardwood floor
- STEP 1
Finish conversation
We talk about how the house lives and how you want the floor to look.
- STEP 2
Samples on the floor
After the final sanding we put a few options on the real floor and leave them overnight.
- STEP 3
Stain and first coat
Stain goes on first, then the first coat of finish once the stain is dry.
- STEP 4
Build coats and cure
The remaining coats go on their schedule. We tell you when traffic, furniture and rugs can return.
What moves the cost of staining and finishing a hardwood floor
Natural finish on a floor that sands clean is the simplest path. Size matters too, because every coat covers the whole area, and stairs and railings are hand finished and priced on their own.
- Natural, stained or reactive stained
- Finish family and coat count
- Square footage
- Stairs and railings
- Custom color matching
Hardwood floor stain and finish questions
Which finish is best for dogs?
A two component waterborne finish stands up best to claws and water bowls because it builds a hard, clear film over the wood. A hardwax oil scratches sooner but can be spot repaired by hand.
Can you match the stain on my existing floor?
We can get close, and we show you how close on a sample first. An exact match is hard because the existing finish has aged and ambered. Where the new area connects to the old, the surest route is to sand and finish both as one floor.
How long before we can walk on the finished floor?
On a waterborne finish, socks the morning after the last coat. Hardwax oils take light traffic after about a day. Furniture goes back after about three days, and rugs wait two weeks.