Hardwood floors in Buffalo houses, and what is under the carpet
Buffalo is the Wright County seat, where Highway 55 and Highway 25 cross. The town grew from about 2,300 people in 1960 to just over 16,000 in 2020, and about three in ten homes went up between 2000 and 2009. The 1990s and 2000s subdivisions on the outer rings of town were built with carpet, and those houses take new hardwood well.
The older blocks around downtown and along Buffalo Lake and Lake Pulaski are a different job. Houses there from the 1920s through the 1950s were built with solid red oak or fir strip, and much of it is still under the carpet.
Hardwood flooring services in Buffalo
Wood floor installation
New hardwood in the 1990s and 2000s subdivisions.
Read more RefinishingSanding and refinishing
Sanding red oak and fir strip near downtown.
Read more FinishesStains and finishes
Sample boards finished and viewed in your own light.
Read more StairsStair treads and risers
Solid stair treads that match a new main floor.
Read moreHardwood flooring questions and answers
Our 2004 Buffalo house is all carpet. Can hardwood go over the subfloor?
In most cases, yes. Buffalo houses from that era have a subfloor meant to carry carpet and pad, which is close to the height of solid hardwood, so doors and transitions tend to work out.
We have a walkout on Lake Pulaski. Can the lower level have real hardwood?
Yes, as glue-down engineered hardwood, and only after a moisture test on the slab. Solid boards nailed over concrete cup when the slab gives off moisture in spring. On the main floor, solid hardwood is fine.