Hardwood floors in Orono lakeshore houses, by era
Orono sits on the north shore of Lake Minnetonka and takes in Crystal Bay, where James J. Hill once kept a farm, along with Maxwell Bay, Stubbs Bay and North Arm. Cottages and estates from the 1890s through the 1930s along the bays were floored in fir and maple, with quartersawn white oak in the formal rooms. Where that wood survives, it refinishes well.
The 1950s through 1970s ramblers and walkouts have red oak strip in the main rooms. Houses built since 2000, often on lots where a cottage came down, have big windows toward the bay, and that is where wide plank white oak belongs.
Hardwood flooring services in Orono
Sanding and refinishing
Restoring fir, maple and quartersawn oak in pre-1940 cottages.
Read more RepairsRepairs
Lacing matched boards into floors cut up for plumbing and heat.
Read more InstallationWood floor installation
White oak in new houses on teardown lots.
Read more PatternsHerringbone, chevron and inlays
Herringbone entries and mudrooms in matching white oak.
Read moreHardwood flooring questions and answers
Can the maple under the carpet in our 1920s Orono cottage be refinished dark?
It can be refinished if enough wood is left, but dark stain on maple is a problem. Maple takes stain in patches, so we steer owners toward a natural finish or a tinted oil.
Does a hardwax oil floor hold up in an Orono lake house with dogs and wet feet?
It does, though it wears differently than a polyurethane. Water sitting for a few minutes beads up and wipes off, and a scratch can be sanded and re-oiled in one spot.