Hardwood floors in Delano's old core and its newer ring
Delano is on the South Fork of the Crow River, with Highway 12 as its main road. The town was platted in 1868, and three downtown buildings from the 1880s and 1890s are on the National Register of Historic Places. About one in eight homes was built before 1940.
Those older houses near downtown and the river were floored with fir, maple or narrow red oak strip, and we want to see them before anyone tears a floor out. About two thirds of Delano's homes were built in the last 45 years, and they suit a new hardwood floor across the main level.
Hardwood flooring services in Delano
Sanding and refinishing
Sanding fir, maple and red oak strip near downtown.
Read more RepairsRepairs
New boards laced in where a wall came out.
Read more InstallationWood floor installation
New hardwood in the 1990s and 2000s houses.
Read more FinishesStains and finishes
Stains and finishes tested on your own boards.
Read moreHardwood flooring questions and answers
Our Delano house is from the 1890s. Is the original floor worth saving?
Save it if it has thickness left. An 1890s floor in Delano is most often fir or maple, and we measure the remaining wood at a few spots before we recommend anything.
How soon can furniture go back after a refinish in a Delano house with radiators?
Two to three days with a hardwax oil, and three days with a waterborne finish. Radiator heat does not change the cure time, but it dries the room, so we ask you to keep the humidity steady.