Skip to content
Service area

Hardwood Floor Installation and Refinishing in Minnetonka, MN

Hardwood floor refinishing and installation for homes in Minnetonka, Minnesota, from Norr Fine Wood Floors, based in Buffalo about 45 minutes to the west. About a third of Minnetonka's homes date from 1940 to 1969, ramblers and split-levels on wooded lots with red oak strip under the carpet.

Dark walnut plank floor in a lamplit study
Dark walnut plank floor in a lamplit study

Minnetonka's postwar houses and the oak hardwood under the carpet

Minnetonka takes in the eastern tip of Lake Minnetonka, where Minnehaha Creek leaves the lake on its way to the Mississippi. Minnetonka Mills, on the creek, was the first permanent settlement west of Minneapolis in the county. The population tripled from 1950 to 1970, and the ramblers from those years are the heart of the city.

They were built with red oak strip in the living room, dining room, hall and bedrooms, then carpeted over in the 1970s and 1980s. The city's 2040 plan calls for preserving the existing housing stock, and the typical project is a remodel or a refinish.

Minnetonka MillsMinnehaha Creek

Hardwood flooring services in Minnetonka

Before you call

Hardwood flooring questions and answers

Our Minnetonka rambler is from 1958. Is the oak under the carpet worth refinishing?

In most cases, yes. The red oak in a 1950s Minnetonka rambler has spent most of its life under carpet, so the wear is shallow. Stained or cut boards are replaced with new wood before sanding.

Will the 1950s red oak in our Minnetonka house always be orange?

It can be cooled down a long way. The orange comes from the old finish, which sanding removes, and from red oak's pink undertone, which a gray or natural tint neutralizes.

Other towns we work in
Start here

Get a quote for a hardwood floor in Minnetonka.

Send a few details and a photo if you have one. We will call to set up a visit and bring samples.

Your details stay with us.

Call Text Consultation