Skip to content
Service area

Hardwood Floor Installation and Refinishing in Long Lake, MN

Norr Fine Wood Floors works across Long Lake, Minnesota, with hardwood floor installation and refinishing from our base in Buffalo, about 35 minutes west by Highway 25 and Highway 12. Long Lake is a small, mature city between Orono and Wayzata with about 770 housing units.

Hardwax oil being wiped onto freshly sanded white oak with a white pad
Hardwax oil being wiped onto freshly sanded white oak with a white pad

Hardwood floors in Long Lake's established houses

Highway 12 runs through Long Lake, and West Wayzata Boulevard, the old Highway 12, is the other main street. The city's eastern end sits on the lake it is named for, and the Cumberland Addition traces back to the original 1855 settlement. The population peaked in 1990.

The 1950s through 1970s houses near downtown have red oak strip in the main rooms under carpet, which sands back and finishes natural. The 1980s houses have the same oak in the kitchen and entry and carpet elsewhere. Where a house is being rebuilt or expanded toward the water, wide plank white oak is a good fit.

Downtown Long LakeLong Lake shorelineCumberland Addition

Hardwood flooring services in Long Lake

Before you call

Hardwood flooring questions and answers

Our 1972 Long Lake house is losing the wall between its oak kitchen and carpeted living room. What do you recommend?

Compare two routes, and we will quote both. One is new red oak laced into the living room and refinished with the kitchen so the seam disappears. The other is new hardwood across both rooms.

Our walkout is on Long Lake. Can the lower level be the same wood as upstairs?

The same species and color, yes, in engineered form. Solid white oak goes upstairs, and engineered white oak is glued to the concrete downstairs after a moisture test. Both get the same finish.

Other towns we work in
Start here

Get a quote for a hardwood floor in Long Lake.

Send a few details and a photo if you have one. We will call to set up a visit and bring samples.

Your details stay with us.

Call Text Consultation